Spazzarini Construction Co., LLC. was awarded the $2,169.409.50 contract with The MDC for the installation of a new 8” Water Main on Ballard Drive, West Hartford CT. This contract includes the installation of 3800LF of 8” Water Main, 115 Water Services, and the lining of over 1300 LF of existing sewer main and services in the area. The 8” Sewer Lining was performed by Insituform and the individual sewer services were lined by National Water Main Cleaning Co.