Pavement Preservation Project, Year 5

Project Description

Location: Enfield CT
Project Completed: Fall 2019
Service: Road Construction

The Project

Spazzarini Construction was awarded the $ 1,408,821.75 contract for the surface replacement of Taylor Road, Polumba Drive, and Elm Street in Enfield CT. This project consisted of 28,450 SY of Asphalt Milling, 10 New Catch Basins, 1000 linear feet of drainage pipe, Replacement of 55 Catch Basin tops, 7,300 SY of Full Depth Asphalt Repair and the installation of 5,684 Tons of Asphalt.

More Projects