Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordfence domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/spazzarini/public_html/wp-includes/functions.php on line 6170
CONNDOT Project 11-151: The Reconstruction of RTE 189 (Bloomfield Ave) at Jerome Ave, Turkey Hill Road, and Gabb Road – Spazzarini Construction Co., LLC

CONNDOT Project 11-151: The Reconstruction of RTE 189 (Bloomfield Ave) at Jerome Ave, Turkey Hill Road, and Gabb Road

Project Description

Location: Bloomfield CT
Project Completed: Fall 2013
Service: Road Reconstruction

The Project

Spazzarini Construction Co., LLC was awarded the $ 1,978,847.15 general contract for the reconstruction of Route 189 (Bloomfield Ave) at Jerome Ave, Turkey Hill Road, and Gabb Road in the spring of 2012. This project includes the realignment of the intersection of Route 189, Turkey Hill Road, and Gabb Road as well as full depth roadway reconstruction of 1000 linear feet of roadway, roadway widening, the installation of drainage and utility systems, and a new traffic signal system. This project was awarded by the Connecticut Department of Transportation.

More Projects