Spazzarini Construction Co., LLC was awarded the $ 1,965,898.90 general contract for the Reconstruction of Kelly Road in South Windsor Connecticut in the spring of 2012. This project includes the full reconstruction of 3,800 linear feet of roadway, new drainage and utility lines, and upgraded pedestrian walkways. This project was awarded by the Town of South Windsor, CT.