Reconstruction of Town Farm Road, Enfield CT

Pavement Preservation Project, Year 5, Enfield CT

West Street Infrastructure Improvements, Stafford Springs CT

Green Manor North Road Reconstruction, Enfield CT

Pinegrove-Tanglewood Road Reconstruction, Enfield CT

Subsurface Sewage Disposal System - Johnson Memorial Hospital, Stafford Springs CT

Post Office Road - Pavement Preservation Project - Year 3, Enfield CT

Mullen Road Reconstruction, Enfield CT

Prospect Hill Road Reconstruction - Phase 2, Windsor CT

Avery Heights - Phase 3, South Windsor CT

Enfield Roads 2015, Steele Southeast Road Reconstruction - Enfield CT

Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 2 - South Windsor CT

Brodie Hall, Suffield Academy - Suffield CT

Eppendorf, Inc. - Enfield CT

Conval, Inc. - Enfield CT

Nufern, Inc - East Granby CT

Freshwater Blvd Pavement Rehabilitation - Enfield CT

Enfield Roads 2015, Park / Taylor Road Reconstruction Project - Enfield CT

RTE 75 Sanitary Sewer and Water Main Extension - Suffield CT

Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 1 - South Windsor CT

Additions and Alterations to Wethersfield High School, Wethersfield CT

Enfield Roads 2015 - Raffia Southwest, Enfield CT

Enfield Roads 2010 - Neelans Park, Enfield CT

2013B-41 Ballard Drive Water Main Replacement, West Hartford CT

Brookdale Senior Living @ Chatfield, West Hartford CT

Arburg Inc., Rocky Hill CT

Enfield Roads 2010, Section 2D, Enfield CT

North Road Sewer Extension: Phase 2, East Windsor, CT

East Longmeadow Senior Living Center, East Longmeadow MA.

New Perimeter Road, Suffield Academy

Longhorn Steakhouse, Enfield CT

Cumberland Farms, Vernon CT

DOT Project 132-127

DOT Project: 88-174

DOT Project: 11-151

Ellington Sewer Extension

DOT Project: 48-186

North Road (RTE 140)

DOT Project 76-205

DOT Project 48-189

Eppendorf

DOT Project 42-297

DOT Project 128-143

DOT Project 04-123

Evergreen Walk

ING Insurance

North Haven Pavilion

Route 190 Improvements

Completed Projects

Town Farm Road Reconstruction, Enfield CT

Project Completed: Fall 2019

Spazzarini Construction was awarded the $ 1,558,850.80 contract for the full depth reconstruction of Town Farm Road in Enfield CT. This project consisted of the installation of a 20’ wide x 60’ long Precast Arch Bridge, 28 New Catch Basins, 3400 linear feet of concrete pipe, 2350 CY of subbase, 1200 CY of Process Aggregate base, and 3,350 Tons of Asphalt.

Town Farm RoadTown Farm




Pavement Preservation Project, Year 5, Enfield CT

Project Completed: Fall 2019

Spazzarini Construction was awarded the $ 1,408,821.75 contract for the surface replacement of Taylor Road, Polumba Drive, and Elm Street in Enfield CT. This project consisted of 28,450 SY of Asphalt Milling, 10 New Catch Basins, 1000 linear feet of drainage pipe, Replacement of 55 Catch Basin tops, 7,300 SY of Full Depth Asphalt Repair and the installation of 5,684 Tons of Asphalt.

ElmSTStafford




West Street Infrastructure Improvements, Stafford Springs, CT

Project Completed: Fall 2019

Spazzarini Construction was awarded the $ 1,484,986.95 contract for the sewer main replacement and roadway improvements of West Main Street, and West Street in Stafford Springs CT. This Sewer Main portion of this project consisted of the installation of 1800 LF of 12” Sewer Main, 900 LF of 6” home and business lateral connections, and a 75’ exposed river crossing. The roadway reconstruction occurred on West Street and West Main Street and included 10 New Catch Basins, 1200 LF of new drainage, 2400 SY of reclamation and mixing of existing roadway base, and 1000 Tons of Asphalt.

StaffordStafford




Green Manor North Road Reconstruction, Enfield CT

Project Completed: Spring 2019

Spazzarini Construction Co. Inc. was awarded the $2,404,765.50 contract for the full depth road reconstruction of Hunter Lane, Sherman Road, Brett Lane, Rogers Lane, Brewster Road, Hale Road, and Marion Place in Enfield CT. This project includes 3500 LF of 12-15” Pipe, 53 complete catch basins, 7,600 CY of Subbase, 5,700 CY of Process Aggregate Base, and 7,600 Tons of Asphalt. This project was completed in the Spring of 2019.

StaffordStafford




Pinegrove-Tanglewood Road Reconstruction, Enfield CT

Project Completed: Spring 2019

Spazzarini Construction Co. Inc. was awarded the $982,988.00 contract for the reconstruction of Tanglewood Avenue, and Pine Grove Avenue in Enfield, CT. This project includes 2,700 LF of 12” to 15” pipe, 21 catch basins, 12 manholes, 2,200 CY of subbase, 1,650 CY of process aggregate base,7000 SF of concrete sidewalks, and 2,270 tons of asphalt. This project was completed in the Spring of 2019.

TanglewoodTanglewood-2




Subsurface Sewage Disposal System - Johnson Memorial Hospital, Stafford Springs CT

Project Completed: Fall 2018

Spazzarini Construction Co. Inc. was awarded the contract to install a new subsurface sewage disposal system for Johnson Memorial Hospital. in Stafford Springs CT. We are working with the engineering firm, GZA GeoEnvironmental, Inc. This project includes 1,680 Ea - Cultec Recharger Chambers, 13,000 LF of 2” Dosing Pipe, 4700 LF of 4” Force Main, 2 Pump Stations, 2 Valve Chambers, 2 Sanitary Manholes, and various tanks ranging from 5,000 Gallons to 15,000 Gallons. This project was completed in the fall of 2018.

StaffordStafford




Post Office Road - Pavement Preservation Project - Year 3, Enfield CT

Project Completed: Spring 2018

Spazzarini Construction Co. Inc. was awarded the $1,118,212.20 contract for the reconstruction of sections of Post Office Road in Enfield CT. This project includes the full replacement of select catch basins, replacement of catch basin tops, 13,000 SY of asphalt reclamation, 4,000 SY of asphalt milling and 4,700 tons of new asphalt. This project is scheduled to be completed in the Spring of 2018.

BenedictBenedict




Mullen Road Reconstruction, Enfield CT

Project Completed: Spring 2018

Spazzarini Construction Co. Inc, was awarded the $ 2,404,765.50 road reconstruction contract located in Enfield, CT. This project includes new drainage, extension of existing drainage culverts, and full depth road reconstruction of 7,215 linear feet of roadway. This project will be complete in the Spring of 2018.

BenedictBenedict




Prospect Hill Road Reconstruction - Phase 2, Windsor CT

Project Completed: Fall 2017

Spazzarini Construction Co. Inc. has been awarded the $ 1,318,237.50 road reconstruction contract located in Windsor, CT. This contract includes new drainage and full depth road reconstruction of Prospect Hill Road. This project will be complete in the Spring of 2018.

BenedictBenedict




Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 3 - South Windsor CT

Project Completed: Fall 2017

Spazzarini Construction Co. Inc. was awarded the $ 1,998,694.05 road reconstruction contract in South Windsor, CT. This project includes new drainage and full depth road reconstruction of Benedict Drive, Pine Tree Lane, Raymond Road, and Manor Lane.

BenedictBenedict




Enfield Roads 2015, Steele Southeast Road Reconstruction - Enfield CT

Project Completed: Fall 2017

Spazzarini Construction Co. Inc. has been awarded the $ 1,668,830.90 road reconstruction contract located in Enfield, CT. This project includes new drainage and full depth road reconstruction of Bass Drive, Colonial Drive, Madison Road, Deepwood Road, and Brentwood Drive.

BenedictBenedict




Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 2 - South Windsor CT

Project Completed: Summer 2017

Spazzarini Construction Co. Inc. was awarded the $ 1,698,526.40 road reconstruction contract in South Windsor, CT. This project includes new drainage and full depth road reconstruction of Peach Tree Lane, Spruce Lane, Highview Road, and Benedict Drive.

BenedictBenedict




Brodie Hall, Suffield Academy - Suffield CT

Project Completed: Summer 2017

Spazzarini Construction Co. Inc was awarded the site work subcontract for the new Brodie Hall Dormatory Facility located at Suffield Academy, in Suffield CT. We are working with the general contractor, FIP Construction. This subcontract includes the installation of site utilities, site drainage, foundation excavation & backfill, concrete flatwork and asphalt driveways.

Cora StreetCora Street




Eppendorf, Inc. - Enfield CT

Project Completed: Spring 2017

Spazzarini Construction Co. Inc. has been contracted by Eppendorf, Inc. to remove and re-install the south driveway and parking areas at their facility located in Enfield, CT. This project includes the removal and replacement of bituminous concrete driveways, parking lots, and asphalt curbing.

Cora StreetCora Street




Conval, Inc. - Enfield CT

Project Completed: Fall 2016

Spazzarini Construction was contracted by Conval, Inc. to remove and re-install new parking lots at their new facility located in Enfield CT. This project included the removal of all existing bituminous concrete parking lots, driveways, and concrete sidewalks and the re-installation of new parking lots, sidewalks, and concrete curbing.

Longhorns, EnfieldLonghorns, Enfield




Nufern, Inc - East Granby CT

Project Completed: Fall 2016

Spazzarini Construction was contracted by Nufern, Inc. to remove and re-install new parking lots at their facility located in East Granby, CT. This project included the removal of existing bituminous concrete parking lots, driveways, and concrete sidewalks and the re-installation of new parking lots, sidewalks, and asphalt curbing.

Cora StreetCora Street




Freshwater Blvd Pavement Rehabilitation - Enfield CT

Project Completed: Fall 2016

Spazzarini Construction Co. Inc. was awarded the $ 878,572.75 pavement rehabilitation contract located in Enfield, CT. This project included the milling and paving of 2300 linear feet of double lane roadway, new ADA sidewalk ramps, and new catch basin tops.

Cora StreetCora Street




Enfield Roads 2015, Park / Taylor Road Reconstruction Project - Enfield CT

Project Completed: Fall 2016

Spazzarini Construction Co. Inc. was awarded the $ 1,868,509.60 road reconstruction contract located in Enfield, CT. This project included new drainage and full depth road reconstruction of Park Street, and a portion of Taylor Road.

Cora StreetCora Street




RTE 75 Sanitary Sewer and Water Main Extension - Suffield CT

Project Completed: Fall 2016

Spazzarini Construction Co. Inc. was awarded the $ 888,310.25 sewer and water main extension contract located in Suffield, CT. This project included the installation of 1700 LF of 12” ductile iron water main, 1100 LF of 8” PVC sewer main, and 2400 SY of bituminous concrete surface overlay.

Cora StreetCora Street




Additions and Alterations to Wethersfield High School, Wethersfield CT

Project Completed: Fall 2016

Spazzarini Construction Co. Inc. was awarded the $ 7,654,000.00 site contract for the Additions and Alterations to Wethersfield High School in Wethersfield, CT. Spazzarini Construction Co. Inc is working with the general contractor, O&G Industries, Inc.

Cora StreetPhase 2 Entrance




Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 1 - South Windsor CT

Project Completed: Summer 2016

Spazzarini Construction Co. Inc. was awarded the $ 1,288,021.90 road reconstruction project located in South Windsor, CT. This Project included new drainage and full depth road reconstruction of Pond Lane, Good Hill Road, Pine Tree Lane and a portion of Benedict Drive.

Cora StreetPhase 2 Entrance




Enfield Roads 2015 - Raffia Southwest, Enfield CT

Project Completed: Summer 2016

Spazzarini Construction Co. Inc. was awarded the $ 2,411,109.71 contract for roadway reconstruction in Enfield, CT. This project includes the full depth road reconstruction of David Street, Debra Street, Donna Street, Ernest Street, Howard Street, Lox Lane, Missile Drive, and Pierce Street.

Cora StreetCora Street




Enfield Roads 2010 - Neelans Park, Enfield CT

Project Completed: Spring 2016

Spazzarini Construction Co. Inc. was awarded the $ 3,712,460.85 contract for roadway reconstruction in Enfield, CT. This project includes the full depth road reconstruction of Christopher Drive, Kimberly Drive, Michael Drive, Neelans Road, Renee Lane, Roland Street, Sam Street, Susan Circle, and Teach Street.

Cora StreetCora Street




2013B-41 Ballard Drive Water Main Replacement, West Hartford CT

Project Completed: Spring 2016

Spazzarini Construction Co. Inc. was awarded the $2,169.409.50 contract with The MDC for the installation of a new 8” Water Main on Ballard Drive, West Hartford CT. This contract includes the installation of 3800LF of 8” Water Main, 115 Water Services, and the lining of over 1300 LF of existing sewer main and services in the area. The 8” Sewer Lining was performed by Insituform and the individual sewer services were lined by National Water Main Cleaning Co.

Cora StreetCora Street




Brookdale Senior Living @ Chatfield, West Hartford CT

Project Completed: Spring 2016

Spazzarini Construction Co. Inc. was awarded the contract for the site work for an addition to Brookdale Senior Living in West Hartford CT. Spazzarini Construction Co. Inc. is working with the General Contractor, JE Dunn Construction. This contract included all site work including site utilities, mass excavation, backfilling, asphalt, and exterior concrete.

Cora StreetCora Street




Arburg Inc., Rocky Hill CT

Project Completed: Summer 2014

Spazzarini Construction Co. Inc. was awarded the site contract for the new North American Headquarters of Arburg, Inc. in Rocky Hill, CT. Spazzarini Construction Co. Inc is working with the general contractor, AZ Corporation. This site includes rock blasting, site excavation, utilities, and the installation of asphalt drives and concrete sidewalks.

ArburgArburg




Enfield Roads 2010, Section 2D, Enfield CT

Project Completed: Spring 2014

Spazzarini Construction Co. Inc. was awarded the $ 1,368,948.00 contract for roadway reconstruction in Enfield Connecticut. This project includes full depth road reconstruction of Cora Street, Play Road, Sky Street and Sun Street.

Cora StreetCora Street




North Road Sewer Extension: Phase 2, East Windsor, CT

Project Completed: Spring 2014

Spazzarini Construction Co. Inc. was awarded the $ 1,581,682.00 contract for new sewer mains on North Road (RTE 140), Rolocut Road, Wells Road, and Melrose Road in East Windsor, CT. This contract includes the installation of new 8” and 6” Sewer mains and laterals to homes without public sewer in the area.

East WindsorEast Windsor




East Longmeadow Senior Living Center, East Longmeadow MA.

Project Completed: Fall 2013

Spazzarini Construction Co. Inc was awarded the site contract for the new East Longmeadow Senior Living Center in East Longmeadow MA. Spazzarini Construction Co. Inc is working with the General Contractor, Howard S. Wright, a Balfour Beatty Company and the Construction Manager KBE Building Corporation on this 10.28 acre project.

East LongmeadowEast Longmeadow




New Perimeter Road, Suffield Academy, Suffield CT

Project Completed: Fall 2013

Spazzarini Construction Co. Inc. was awarded the $ 546,832.00 roadwork contract for the New Perimeter Road on the Suffield Academy Campus in Suffield, CT. This contract includes all earthwork, storm and utility lines, retaining walls, granite curbing, sidewalks and site lighting.

Suffield AcademySuffield Academy




Longhorn Steakhouse, Enfield CT

Project Completed: Fall 2013

Spazzarini Construction Co. Inc. was awarded the $ 410,468.00 site contract for the new Longhorns Steakhouse in Enfield, CT. We are currently working with the management company,Benderson Development Co. LLC. This project includes all underground utilities around the new building, and a new retaining wall to increase the property’s parking lot size.

Longhorns, EnfieldLonghorns, Enfield




Cumberland Farms, Vernon CT

Project Completed: Summer 2013

Spazzarini Construction Co. Inc. was awarded the $505,000.00 site contract for the new Cumberland Farms in Vernon CT. This 1.30 acre project includes all site preparation, excavation, drainage and utilities, a modular block retaining wall, and the paving of parking lots. Spazzarini Construction Co. Inc is working with, D.F. Prey General Contractors to complete this project in the Summer of 2013.

CUmberland FarmsCumberland Farms




Project 132-127: The Reconstruction of Kelly Road, South Windsor CT

Project Completed: Summer 2013

Spazzarini Construction Co. Inc was awarded the $ 1,965,898.90 general contract for the Reconstruction of Kelly Road in South Windsor Connecticut in the spring of 2012. This project includes the full reconstruction of 3,800 linear feet of roadway, new drainage and utility lines, and upgraded pedestrian walkways. This project was awarded by the Town of South Windsor, CT.

Kelly RoadKelly Road




Project 88-174: The Reconstruction of Beaver Street, New Britain CT.

Project Completed: Summer 2013

Spazzarini Construction Co. Inc was awarded the $ 1,925,697.35 general contract for the Beaver Street Reconstruction in New Britain Connecticut in the spring of 2012. This project includes the full depth road reconstruction of 2200 linear feet of roadway, new drainage systems, textured concrete, pedestrian walkways, and granite curbing. This project was awarded by the City of New Britain, CT.




CONNDOT Project 11-151: The Reconstruction of Route 189 (Bloomfield Ave) at Jerome Ave, Turkey Hill Road, and Gabb Road, Bloomfield CT.

Project Completed: Fall 2013

Spazzarini Construction Co. Inc was awarded the $ 1,978,847.15 general contract for the reconstruction of Route 189 (Bloomfield Ave) at Jerome Ave, Turkey Hill Road, and Gabb Road in the spring of 2012. This project includes the realignment of the intersection of Route 189, Turkey Hill Road, and Gabb Road as well as full depth roadway reconstruction of 1000 linear feet of roadway, roadway widening, the installation of drainage and utility systems, and a new traffic signal system. This project was awarded by the Connecticut Department of Transportation.

Jerome AveJerome Ave




Stafford Road (Route 30) Sanitary Sewer Extension, Ellington CT

Project Completed: Spring 2013

Spazzarini Construction Co. Inc was awarded the $ 248,000.00 general contract for the Stafford Road (Route 30) Sanitary Sewer Extension in the fall of 2012. This project includes the installation of 2500 linear feet of forced sewer main, installation of manholes, and roadway patching. This project was awarded by the Town of Ellington, CT.

RTE 30RTE 30




CONN DOT Project 48-186: The Reconstruction of Post Office Road / Town Farm Road, Enfield CT

Project Completed: Summer 2012

Spazzarini Construction Co. Inc was awarded the $ 4,638,874.60 general contract for the Reconstruction of Post Office Road / Town Farm Road in Enfield CT. This project included full depth reconstruction of 7000 linear feet of roadway, bridge alteration / extension, drainage and utilities, and intersection improvements. This project was awarded by the Connecticut Department of Transportation.

48-18648-186




North Road (Route 140) Sanitary Sewer Extension, East Windsor CT

Project Completed: Summer 2012

Spazzarini Construction Co. Inc was awarded the $ 3,447,450.00 general contract for the North Road (Route 140) Sanitary Sewer Extension in East Windsor, CT. This project included installing 9000 linear feet of gravity sanitary sewer pipe, Installation of a pump station, and milling and paving. This project was completed with heavy traffic constraints on time and on budget. It was awarded by the Town Of East Windsor Water Pollution Control Authority.

RTE 140RTE 140




CONN DOT Project 76-205: Intersection Improvements at Routes 6 & 44 and New State Road and Middle Turnpike West, Manchester CT

Project Completed: Spring 2012

Spazzarini Construction Co. Inc was awarded the $ 5,278,865.33 general contract for the Intersection Improvements at Routes 6 & 44 and New State Road and Middle Turnpike West in Manchester CT. This project included full depth reconstruction of 7500 linear feet of Roadway, drainage, pedestrian improvements while dealing with challenging traffic constraints. Spazzarini Construction Co. Inc. was awarded the 2012 Arthur W. Gruhn Excellence in Construction Award for Challenging Projects by the Connecticut Department of Transportation.

Manchester IntersectionManchester Intersection




CONN DOT Project 46-189: Intersection Improvements at Freshwater Boulevard and Cranbrook Boulevard, Enfield CT

Project Completed: Fall 2011

Spazzarini Construction Co. Inc was awarded the $ 368,334.96 general contract for the Intersection Improvements at Freshwater Boulevard and Cranbrook Boulevard in Enfield CT. This project included roadway widening, milling and paving, traffic equipment improvements and pedestrian improvements. This project was awarded by the Connecticut Department of Transportation.

Freshwater/Cranbrook INT.Freshwater/Cranbrook INT.




Eppendorf Manufacturing Inc, Enfield CT

Project Completed: Spring 2011

Spazzarini Construction Co. Inc worked as a site contractor under the General Contractor A.Z. Corporation for a large addition at the Eppendorf Manufacturing Inc. in Enfield CT. This project’s contract included land clearing, excavation, new drainage systems, and the paving around the facility’s new addition.

Manchester IntersectionManchester Intersection




CONN DOT Project 42-297: Intersection Improvements at State Route 502 (Silver Lane) and Forbes Street, East Hartford CT.

Project Completed: Spring 2011

Spazzarini Construction Co. Inc was awarded the $ 1,565,549.16 general contract for the Intersection Improvements at State Route 502 (Silver Lane) and Forbes Street in East Hartford, CT. This project included road widening, intersection widening, traffic equipment upgrades, and milling and paving. This project was awarded by the Connecticut Department of Transportation.

BenedictBenedict




CONN DOT Project 128-143: RTE 10/US 202 improvements, Simsbury CT

Spazzarini Construction Co., Inc. was awarded the $1,698,972 general contract for the reconstruction of Routes 10 / US 202 at the intersection of Drake Hill Rd and Route 167 to facilitate the construction of the multi-use trail. Aside from road reconstruction, this project includes the construction of retaining walls, drainage improvements and modifications to the existing bridge structure. This contract was awarded by the Connecticut Department of Transportation.

Rt10 US 202 Project in Simsbury




CONN DOT Project 04-123: Reconstruction of Avon Mountain Road, Avon CT

Spazzarini Construction Co., Inc. was awarded the $13,250,545 general contract for the road reconstruction on Rt. 44 in Avon by the Connecticut Department of Transportation. This 3 year project focuses on safety and traffic improvements such as widening the road and shoulders, softening existing curves, and constructing a median to separate opposing traffic. This project also includes the closure of an intersection and the modification of others. In addition to the safety improvements, this project consists of various drainage updates and modifications.

Rt44 Project in Avon




The Promenade Shops at
Evergreen Walk

The Promenade Shops at Evergreen WalkSpazzarini Construction Company, Inc. worked as site contractor under Hoar Construction, LLC (general contractor) during the construction of this 1.2 million square foot lifestyle center created by developer Poag & McEwen Lifestyle Centers. Fifty-Six acres were cleared to make room for more than fifty upscale retailers and restaurateurs now occupying the buildings erected for this project.




ING Life Insurance & Annuity Company
(Windsor Regional Office)

Spazzarini Construction Company, Inc. was awarded the general contract for site work for the construction of the Regional Office Headquarters of ING Life Insurance & Annuity Company. Spazzarini paired with the Boston office of Trammell Crow Company in this 47 acre project which was completed in the fall of 2007. To the right are some photos that illustrate the site work that was done on this project.

 

 

 

 




North Haven Pavilion

Spazzarini Construction Company, Inc. worked as site contractor under Regional Construction Corporation (general contractor) for the construction of this 18 acres project developed for National Realty & Development Corp (NRDC). Upon completion, the North Haven Pavilion became home to 20 stores including Target, Sports Authority and Michael's as anchor stores for the complex.

 




Route 190 Improvements

Spazzarini Construction Company, Inc. was awarded the general contract for improvements on Route 190 at the intersections of Middle Road & Palomba Road and South Road & Elm Street in Enfield. This contract was awarded and overseen by the Connecticut Department of Transportation.

Spazzarini Construction Inc. is one of Connecticut's leading providers of general contracting, road construction and site preparation services. We are located in Enfield, CT but we service clients throughout all of north-central Connecticut and western Massachusetts. This includes, but is not limited to the communities of Enfield CT, East Windsor CT, Somers CT, Suffield CT, Windsor CT, Broad Brook CT, Tolland CT, Vernon CT, Rockville CT, Hartford CT, Bloomfield CT, Longmeadow MA, East Longmeadow MA, Agawam MA, Chicopee MA, Springfield MA, West Springfield MA and Westfield MA. Please call us at 860-745-5683 for all your general contracting, road construction and site preparation needs.