Completed ProjectsConnecticut Water Company - New Pump Station, Somers CTProject Completed: Spring 2020 Spazzarini Construction Co. Inc. was contracted for the site work associated with a new Connecticut Water Company Pump Station located in Somers CT. This Contract included the installation of the building foundation, 12” DIP connection to new Water Main in road, and the installation of Building Utilities for the new station. Spazzarini Construction was also contracted to install the prefabricated pump station manufactured by United Concrete. This fully assembled building shipped on 4 trailers and was installed by Bay Crane Inc. The Precast building weighed a total of 164,000 Lbs. Crossroad Cathedral, East Windsor, CTProject Completed: Spring 2020 Spazzarini Construction was awarded the contract for sitework associated with the renovations of the old La Renaissance banquet hall into Crossroads Cathedral. This contract also included offsite work located on RTE 5 in East Windsor, widening the roadway to now include a new turning lane into the property. Onsite work included reclaiming and paving the parking lots, installation of new concrete walkways, installation of guard rails and fencing, and the demolition and removal of an old house located adjacent to the property. Town Farm Road Reconstruction, Enfield CTProject Completed: Fall 2019 Spazzarini Construction was awarded the $ 1,558,850.80 contract for the full depth reconstruction of Town Farm Road in Enfield CT. This project consisted of the installation of a 20’ wide x 60’ long Precast Arch Bridge, 28 New Catch Basins, 3400 linear feet of concrete pipe, 2350 CY of subbase, 1200 CY of Process Aggregate base, and 3,350 Tons of Asphalt. Pavement Preservation Project, Year 5, Enfield CTProject Completed: Fall 2019 Spazzarini Construction was awarded the $ 1,408,821.75 contract for the surface replacement of Taylor Road, Polumba Drive, and Elm Street in Enfield CT. This project consisted of 28,450 SY of Asphalt Milling, 10 New Catch Basins, 1000 linear feet of drainage pipe, Replacement of 55 Catch Basin tops, 7,300 SY of Full Depth Asphalt Repair and the installation of 5,684 Tons of Asphalt. West Street Infrastructure Improvements, Stafford Springs, CTProject Completed: Fall 2019 Spazzarini Construction was awarded the $ 1,484,986.95 contract for the sewer main replacement and roadway improvements of West Main Street, and West Street in Stafford Springs CT. This Sewer Main portion of this project consisted of the installation of 1800 LF of 12” Sewer Main, 900 LF of 6” home and business lateral connections, and a 75’ exposed river crossing. The roadway reconstruction occurred on West Street and West Main Street and included 10 New Catch Basins, 1200 LF of new drainage, 2400 SY of reclamation and mixing of existing roadway base, and 1000 Tons of Asphalt. Green Manor North Road Reconstruction, Enfield CTProject Completed: Spring 2019 Spazzarini Construction Co. Inc. was awarded the $2,404,765.50 contract for the full depth road reconstruction of Hunter Lane, Sherman Road, Brett Lane, Rogers Lane, Brewster Road, Hale Road, and Marion Place in Enfield CT. This project includes 3500 LF of 12-15” Pipe, 53 complete catch basins, 7,600 CY of Subbase, 5,700 CY of Process Aggregate Base, and 7,600 Tons of Asphalt. This project was completed in the Spring of 2019. Pinegrove-Tanglewood Road Reconstruction, Enfield CTProject Completed: Spring 2019 Spazzarini Construction Co. Inc. was awarded the $982,988.00 contract for the reconstruction of Tanglewood Avenue, and Pine Grove Avenue in Enfield, CT. This project includes 2,700 LF of 12” to 15” pipe, 21 catch basins, 12 manholes, 2,200 CY of subbase, 1,650 CY of process aggregate base,7000 SF of concrete sidewalks, and 2,270 tons of asphalt. This project was completed in the Spring of 2019. Subsurface Sewage Disposal System - Johnson Memorial Hospital, Stafford Springs CTProject Completed: Fall 2018 Spazzarini Construction Co. Inc. was awarded the contract to install a new subsurface sewage disposal system for Johnson Memorial Hospital. in Stafford Springs CT. We are working with the engineering firm, GZA GeoEnvironmental, Inc. This project includes 1,680 Ea - Cultec Recharger Chambers, 13,000 LF of 2” Dosing Pipe, 4700 LF of 4” Force Main, 2 Pump Stations, 2 Valve Chambers, 2 Sanitary Manholes, and various tanks ranging from 5,000 Gallons to 15,000 Gallons. This project was completed in the fall of 2018. Post Office Road - Pavement Preservation Project - Year 3, Enfield CTProject Completed: Spring 2018 Spazzarini Construction Co. Inc. was awarded the $1,118,212.20 contract for the reconstruction of sections of Post Office Road in Enfield CT. This project includes the full replacement of select catch basins, replacement of catch basin tops, 13,000 SY of asphalt reclamation, 4,000 SY of asphalt milling and 4,700 tons of new asphalt. This project is scheduled to be completed in the Spring of 2018. Mullen Road Reconstruction, Enfield CTProject Completed: Spring 2018 Spazzarini Construction Co. Inc, was awarded the $ 2,404,765.50 road reconstruction contract located in Enfield, CT. This project includes new drainage, extension of existing drainage culverts, and full depth road reconstruction of 7,215 linear feet of roadway. This project will be complete in the Spring of 2018. Prospect Hill Road Reconstruction - Phase 2, Windsor CTProject Completed: Fall 2017 Spazzarini Construction Co. Inc. has been awarded the $ 1,318,237.50 road reconstruction contract located in Windsor, CT. This contract includes new drainage and full depth road reconstruction of Prospect Hill Road. This project will be complete in the Spring of 2018. Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 3 - South Windsor CTProject Completed: Fall 2017 Spazzarini Construction Co. Inc. was awarded the $ 1,998,694.05 road reconstruction contract in South Windsor, CT. This project includes new drainage and full depth road reconstruction of Benedict Drive, Pine Tree Lane, Raymond Road, and Manor Lane. Enfield Roads 2015, Steele Southeast Road Reconstruction - Enfield CTProject Completed: Fall 2017 Spazzarini Construction Co. Inc. has been awarded the $ 1,668,830.90 road reconstruction contract located in Enfield, CT. This project includes new drainage and full depth road reconstruction of Bass Drive, Colonial Drive, Madison Road, Deepwood Road, and Brentwood Drive. Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 2 - South Windsor CTProject Completed: Summer 2017 Spazzarini Construction Co. Inc. was awarded the $ 1,698,526.40 road reconstruction contract in South Windsor, CT. This project includes new drainage and full depth road reconstruction of Peach Tree Lane, Spruce Lane, Highview Road, and Benedict Drive. Brodie Hall, Suffield Academy - Suffield CTProject Completed: Summer 2017 Spazzarini Construction Co. Inc was awarded the site work subcontract for the new Brodie Hall Dormatory Facility located at Suffield Academy, in Suffield CT. We are working with the general contractor, FIP Construction. This subcontract includes the installation of site utilities, site drainage, foundation excavation & backfill, concrete flatwork and asphalt driveways. Eppendorf, Inc. - Enfield CTProject Completed: Spring 2017 Spazzarini Construction Co. Inc. has been contracted by Eppendorf, Inc. to remove and re-install the south driveway and parking areas at their facility located in Enfield, CT. This project includes the removal and replacement of bituminous concrete driveways, parking lots, and asphalt curbing. Conval, Inc. - Enfield CTProject Completed: Fall 2016 Spazzarini Construction was contracted by Conval, Inc. to remove and re-install new parking lots at their new facility located in Enfield CT. This project included the removal of all existing bituminous concrete parking lots, driveways, and concrete sidewalks and the re-installation of new parking lots, sidewalks, and concrete curbing. Nufern, Inc - East Granby CTProject Completed: Fall 2016 Spazzarini Construction was contracted by Nufern, Inc. to remove and re-install new parking lots at their facility located in East Granby, CT. This project included the removal of existing bituminous concrete parking lots, driveways, and concrete sidewalks and the re-installation of new parking lots, sidewalks, and asphalt curbing. Freshwater Blvd Pavement Rehabilitation - Enfield CTProject Completed: Fall 2016 Spazzarini Construction Co. Inc. was awarded the $ 878,572.75 pavement rehabilitation contract located in Enfield, CT. This project included the milling and paving of 2300 linear feet of double lane roadway, new ADA sidewalk ramps, and new catch basin tops. Enfield Roads 2015, Park / Taylor Road Reconstruction Project - Enfield CTProject Completed: Fall 2016 Spazzarini Construction Co. Inc. was awarded the $ 1,868,509.60 road reconstruction contract located in Enfield, CT. This project included new drainage and full depth road reconstruction of Park Street, and a portion of Taylor Road. RTE 75 Sanitary Sewer and Water Main Extension - Suffield CTProject Completed: Fall 2016 Spazzarini Construction Co. Inc. was awarded the $ 888,310.25 sewer and water main extension contract located in Suffield, CT. This project included the installation of 1700 LF of 12” ductile iron water main, 1100 LF of 8” PVC sewer main, and 2400 SY of bituminous concrete surface overlay. Additions and Alterations to Wethersfield High School, Wethersfield CTProject Completed: Fall 2016 Spazzarini Construction Co. Inc. was awarded the $ 7,654,000.00 site contract for the Additions and Alterations to Wethersfield High School in Wethersfield, CT. Spazzarini Construction Co. Inc is working with the general contractor, O&G Industries, Inc. Avery Heights Neighborhood Pavement and Drainage Improvements, Phase 1 - South Windsor CTProject Completed: Summer 2016 Spazzarini Construction Co. Inc. was awarded the $ 1,288,021.90 road reconstruction project located in South Windsor, CT. This Project included new drainage and full depth road reconstruction of Pond Lane, Good Hill Road, Pine Tree Lane and a portion of Benedict Drive. Enfield Roads 2015 - Raffia Southwest, Enfield CTProject Completed: Summer 2016 Spazzarini Construction Co. Inc. was awarded the $ 2,411,109.71 contract for roadway reconstruction in Enfield, CT. This project includes the full depth road reconstruction of David Street, Debra Street, Donna Street, Ernest Street, Howard Street, Lox Lane, Missile Drive, and Pierce Street. Enfield Roads 2010 - Neelans Park, Enfield CTProject Completed: Spring 2016 Spazzarini Construction Co. Inc. was awarded the $ 3,712,460.85 contract for roadway reconstruction in Enfield, CT. This project includes the full depth road reconstruction of Christopher Drive, Kimberly Drive, Michael Drive, Neelans Road, Renee Lane, Roland Street, Sam Street, Susan Circle, and Teach Street. 2013B-41 Ballard Drive Water Main Replacement, West Hartford CTProject Completed: Spring 2016 Spazzarini Construction Co. Inc. was awarded the $2,169.409.50 contract with The MDC for the installation of a new 8” Water Main on Ballard Drive, West Hartford CT. This contract includes the installation of 3800LF of 8” Water Main, 115 Water Services, and the lining of over 1300 LF of existing sewer main and services in the area. The 8” Sewer Lining was performed by Insituform and the individual sewer services were lined by National Water Main Cleaning Co. Brookdale Senior Living @ Chatfield, West Hartford CTProject Completed: Spring 2016 Spazzarini Construction Co. Inc. was awarded the contract for the site work for an addition to Brookdale Senior Living in West Hartford CT. Spazzarini Construction Co. Inc. is working with the General Contractor, JE Dunn Construction. This contract included all site work including site utilities, mass excavation, backfilling, asphalt, and exterior concrete. Arburg Inc., Rocky Hill CTProject Completed: Summer 2014 Spazzarini Construction Co. Inc. was awarded the site contract for the new North American Headquarters of Arburg, Inc. in Rocky Hill, CT. Spazzarini Construction Co. Inc is working with the general contractor, AZ Corporation. This site includes rock blasting, site excavation, utilities, and the installation of asphalt drives and concrete sidewalks. Enfield Roads 2010, Section 2D, Enfield CTProject Completed: Spring 2014 Spazzarini Construction Co. Inc. was awarded the $ 1,368,948.00 contract for roadway reconstruction in Enfield Connecticut. This project includes full depth road reconstruction of Cora Street, Play Road, Sky Street and Sun Street. North Road Sewer Extension: Phase 2, East Windsor, CTProject Completed: Spring 2014 Spazzarini Construction Co. Inc. was awarded the $ 1,581,682.00 contract for new sewer mains on North Road (RTE 140), Rolocut Road, Wells Road, and Melrose Road in East Windsor, CT. This contract includes the installation of new 8” and 6” Sewer mains and laterals to homes without public sewer in the area. East Longmeadow Senior Living Center, East Longmeadow MA.Project Completed: Fall 2013 Spazzarini Construction Co. Inc was awarded the site contract for the new East Longmeadow Senior Living Center in East Longmeadow MA. Spazzarini Construction Co. Inc is working with the General Contractor, Howard S. Wright, a Balfour Beatty Company and the Construction Manager KBE Building Corporation on this 10.28 acre project. New Perimeter Road, Suffield Academy, Suffield CTProject Completed: Fall 2013 Spazzarini Construction Co. Inc. was awarded the $ 546,832.00 roadwork contract for the New Perimeter Road on the Suffield Academy Campus in Suffield, CT. This contract includes all earthwork, storm and utility lines, retaining walls, granite curbing, sidewalks and site lighting. Longhorn Steakhouse, Enfield CTProject Completed: Fall 2013 Spazzarini Construction Co. Inc. was awarded the $ 410,468.00 site contract for the new Longhorns Steakhouse in Enfield, CT. We are currently working with the management company,Benderson Development Co. LLC. This project includes all underground utilities around the new building, and a new retaining wall to increase the property’s parking lot size. Cumberland Farms, Vernon CTProject Completed: Summer 2013 Spazzarini Construction Co. Inc. was awarded the $505,000.00 site contract for the new Cumberland Farms in Vernon CT. This 1.30 acre project includes all site preparation, excavation, drainage and utilities, a modular block retaining wall, and the paving of parking lots. Spazzarini Construction Co. Inc is working with, D.F. Prey General Contractors to complete this project in the Summer of 2013. Project 132-127: The Reconstruction of Kelly Road, South Windsor CTProject Completed: Summer 2013 Spazzarini Construction Co. Inc was awarded the $ 1,965,898.90 general contract for the Reconstruction of Kelly Road in South Windsor Connecticut in the spring of 2012. This project includes the full reconstruction of 3,800 linear feet of roadway, new drainage and utility lines, and upgraded pedestrian walkways. This project was awarded by the Town of South Windsor, CT. Project 88-174: The Reconstruction of Beaver Street, New Britain CT.Project Completed: Summer 2013 Spazzarini Construction Co. Inc was awarded the $ 1,925,697.35 general contract for the Beaver Street Reconstruction in New Britain Connecticut in the spring of 2012. This project includes the full depth road reconstruction of 2200 linear feet of roadway, new drainage systems, textured concrete, pedestrian walkways, and granite curbing. This project was awarded by the City of New Britain, CT. CONNDOT Project 11-151: The Reconstruction of Route 189 (Bloomfield Ave) at Jerome Ave, Turkey Hill Road, and Gabb Road, Bloomfield CT.Project Completed: Fall 2013 Spazzarini Construction Co. Inc was awarded the $ 1,978,847.15 general contract for the reconstruction of Route 189 (Bloomfield Ave) at Jerome Ave, Turkey Hill Road, and Gabb Road in the spring of 2012. This project includes the realignment of the intersection of Route 189, Turkey Hill Road, and Gabb Road as well as full depth roadway reconstruction of 1000 linear feet of roadway, roadway widening, the installation of drainage and utility systems, and a new traffic signal system. This project was awarded by the Connecticut Department of Transportation. Stafford Road (Route 30) Sanitary Sewer Extension, Ellington CTProject Completed: Spring 2013 Spazzarini Construction Co. Inc was awarded the $ 248,000.00 general contract for the Stafford Road (Route 30) Sanitary Sewer Extension in the fall of 2012. This project includes the installation of 2500 linear feet of forced sewer main, installation of manholes, and roadway patching. This project was awarded by the Town of Ellington, CT. CONN DOT Project 48-186: The Reconstruction of Post Office Road / Town Farm Road, Enfield CTProject Completed: Summer 2012 Spazzarini Construction Co. Inc was awarded the $ 4,638,874.60 general contract for the Reconstruction of Post Office Road / Town Farm Road in Enfield CT. This project included full depth reconstruction of 7000 linear feet of roadway, bridge alteration / extension, drainage and utilities, and intersection improvements. This project was awarded by the Connecticut Department of Transportation. North Road (Route 140) Sanitary Sewer Extension, East Windsor CTProject Completed: Summer 2012 Spazzarini Construction Co. Inc was awarded the $ 3,447,450.00 general contract for the North Road (Route 140) Sanitary Sewer Extension in East Windsor, CT. This project included installing 9000 linear feet of gravity sanitary sewer pipe, Installation of a pump station, and milling and paving. This project was completed with heavy traffic constraints on time and on budget. It was awarded by the Town Of East Windsor Water Pollution Control Authority. CONN DOT Project 76-205: Intersection Improvements at Routes 6 & 44 and New State Road and Middle Turnpike West, Manchester CTProject Completed: Spring 2012 Spazzarini Construction Co. Inc was awarded the $ 5,278,865.33 general contract for the Intersection Improvements at Routes 6 & 44 and New State Road and Middle Turnpike West in Manchester CT. This project included full depth reconstruction of 7500 linear feet of Roadway, drainage, pedestrian improvements while dealing with challenging traffic constraints. Spazzarini Construction Co. Inc. was awarded the 2012 Arthur W. Gruhn Excellence in Construction Award for Challenging Projects by the Connecticut Department of Transportation. CONN DOT Project 46-189: Intersection Improvements at Freshwater Boulevard and Cranbrook Boulevard, Enfield CTProject Completed: Fall 2011 Spazzarini Construction Co. Inc was awarded the $ 368,334.96 general contract for the Intersection Improvements at Freshwater Boulevard and Cranbrook Boulevard in Enfield CT. This project included roadway widening, milling and paving, traffic equipment improvements and pedestrian improvements. This project was awarded by the Connecticut Department of Transportation. Eppendorf Manufacturing Inc, Enfield CTProject Completed: Spring 2011 Spazzarini Construction Co. Inc worked as a site contractor under the General Contractor A.Z. Corporation for a large addition at the Eppendorf Manufacturing Inc. in Enfield CT. This project’s contract included land clearing, excavation, new drainage systems, and the paving around the facility’s new addition. CONN DOT Project 42-297: Intersection Improvements at State Route 502 (Silver Lane) and Forbes Street, East Hartford CT.Project Completed: Spring 2011 Spazzarini Construction Co. Inc was awarded the $ 1,565,549.16 general contract for the Intersection Improvements at State Route 502 (Silver Lane) and Forbes Street in East Hartford, CT. This project included road widening, intersection widening, traffic equipment upgrades, and milling and paving. This project was awarded by the Connecticut Department of Transportation. CONN DOT Project 128-143: RTE 10/US 202 improvements, Simsbury CTSpazzarini Construction Co., Inc. was awarded the $1,698,972 general contract for the reconstruction of Routes 10 / US 202 at the intersection of Drake Hill Rd and Route 167 to facilitate the construction of the multi-use trail. Aside from road reconstruction, this project includes the construction of retaining walls, drainage improvements and modifications to the existing bridge structure. This contract was awarded by the Connecticut Department of Transportation. CONN DOT Project 04-123: Reconstruction of Avon Mountain Road, Avon CTSpazzarini Construction Co., Inc. was awarded the $13,250,545 general contract for the road reconstruction on Rt. 44 in Avon by the Connecticut Department of Transportation. This 3 year project focuses on safety and traffic improvements such as widening the road and shoulders, softening existing curves, and constructing a median to separate opposing traffic. This project also includes the closure of an intersection and the modification of others. In addition to the safety improvements, this project consists of various drainage updates and modifications. The Promenade Shops at
|
Spazzarini Construction Company, Inc. was awarded the general contract for site work for the construction of the Regional Office Headquarters of ING Life Insurance & Annuity Company. Spazzarini paired with the Boston office of Trammell Crow Company in this 47 acre project which was completed in the fall of 2007. To the right are some photos that illustrate the site work that was done on this project.
Spazzarini Construction Company, Inc. worked as site contractor under Regional Construction Corporation (general contractor) for the construction of this 18 acres project developed for National Realty & Development Corp (NRDC). Upon completion, the North Haven Pavilion became home to 20 stores including Target, Sports Authority and Michael's as anchor stores for the complex.
Spazzarini Construction Company, Inc. was awarded the general contract for improvements on Route 190 at the intersections of Middle Road & Palomba Road and South Road & Elm Street in Enfield. This contract was awarded and overseen by the Connecticut Department of Transportation.
![]() |
Home
•
Equipment
•
Services
•
Projects
•
Links
•
Contact
©Copyright 2020. All rights reserved.
|
Spazzarini Construction Inc. is one of Connecticut's leading providers of general contracting, road construction and site preparation services. We are located in Enfield, CT but we service clients throughout all of north-central Connecticut and western Massachusetts. This includes, but is not limited to the communities of Enfield CT, East Windsor CT, Somers CT, Suffield CT, Windsor CT, Broad Brook CT, Tolland CT, Vernon CT, Rockville CT, Hartford CT, Bloomfield CT, Longmeadow MA, East Longmeadow MA, Agawam MA, Chicopee MA, Springfield MA, West Springfield MA and Westfield MA. Please call us at 860-745-5683 for all your general contracting, road construction and site preparation needs. |