Spazzarini Construction Co., LLC was awarded the $ 1,238,450.79 contract by the CTDOT for the installation of a new commuter parking lot for the CTFastrak commuter bus system. This parking lot is located adjacent to I-84 on RTE 6 in Farmington, CT. This project included 9100 CY of earth excavation, 1,900 CY of Subbase, 1,400 CY of Process Aggregate, 2 Catch Basins with 500 LF of RCP Pipe, 11,060 SF of Concrete Sidewalks, and 2000 Tons of Asphalt.