Spazzarini Construction Co., LLC was awarded the Beelzebub Road Reconstruction project in the summer of 2022. This 2 phased project consists of full depth road replacement of Beelzebub Road from the intersection of Avery Street to the intersection of Foster Street. The project includes the installation of New Drainage and roadway grading to alleviate drainage issues on the road. Phase 1 was completed in 2022 and Phase 2 is slated to be completed in the Summer of 2023.